When using cooling water Valve in the power industry, the following precautions apply:
- Installation: Before installation, clean the pipes to remove debris and rust, ensuring smooth valve disc movement and a secure seal. During installation, pay attention to the valve flow direction markings to ensure correct orientation, secure connections, and reliable sealing. For electric and pneumatic Valve data center, connect the drive and control systems and conduct commissioning. Check that the valve disc opens and closes properly, the drive operates normally, and that the sealing performance meets specifications.
- Operation: Before operation, inspect the equipment for damage and leaks, the electrical device, any stuck transmission components, the correct valve opening and closing status and position, and the tightness of the pipe connections. During operation, ensure a stable power supply and follow standard procedures, such as tightening the blind plate before opening or closing the gate. During operation, monitor the motor and blind plate status and stop immediately if any abnormality occurs. Furthermore, static grounding measures must be implemented for cooling water Valve in areas with explosion or fire hazards.
- Maintenance: Regularly check the sealing performance of the blind plate and the valve body, clean the surface of the valve body and the blind plate, lubricate the moving parts, check the wear of the transmission parts and replace them in time, check the electrical system and replace damaged components in time.